View Single Post
Old 25-05-2022, 08:54   #26
1andrew1
cf.mega poster
 
Join Date: Dec 2013
Posts: 14,235
1andrew1 is cast in bronze1andrew1 is cast in bronze1andrew1 is cast in bronze1andrew1 is cast in bronze
1andrew1 is cast in bronze1andrew1 is cast in bronze1andrew1 is cast in bronze1andrew1 is cast in bronze1andrew1 is cast in bronze1andrew1 is cast in bronze1andrew1 is cast in bronze1andrew1 is cast in bronze1andrew1 is cast in bronze1andrew1 is cast in bronze1andrew1 is cast in bronze1andrew1 is cast in bronze1andrew1 is cast in bronze1andrew1 is cast in bronze
Re: Elizabeth Line (Crossrail) opens

Quote:
Originally Posted by Pierre View Post
If HS2 ever makes it to Leeds, I’ll be long dead by the time it does. The East Coast mainline is plenty fast enough. I can get to Kings Cross in 2hrs non-stop, and 2.15 with limited stops.

I’ve no desire to get to London any quicker.
As you say, current lines are pretty good - around two hours to Manchester or Leeds and the trains are pretty comfortable too.

HS2 is a poor choice of brand, its need was really all about extra capacity and not so much speed, though the two are of course related.
1andrew1 is offline   Reply With Quote