Quote:
Originally Posted by spiderplant
Actually
"Great Britain’s electricity market currently has 6GW of electricity interconnector capacity:
3GW to France (IFA and IFA2)
1GW to the Netherlands (BritNed)
1GW to Belgium (Nemo Link)
500MW to Northern Ireland (Moyle)
500MW to the Republic of Ireland (East West)."
plus one to Norway currently under construction.
(Source: Ofgem)
|
How many of of those interconnector links don't involve England, ie not Scotland.
Norway interconnector
Quote:
The interconnector will be connected in Blyth in Northumberland in the UK, and in Kvilldal in Suldal on the Norwegian side. These locations are chosen after thorough considerations, and will make sure that the interconnector is connected to strong points in the British and Norwegian grids.
|
Link
Quote:
Since 2014 the majority (87.8%) of electricity transferred by interconnector has been imported into Great Britain.
|
Less than 2 mins for me to disprove.